Air Conditioning Energy Assessment

Under the European Performance of Building Directive, owners / operators of refrigeration based air conditioning systems have a legal requirement for such systems to be assessed for energy efficiency. Not having the assessment report carried out could result in a fine.

For systems exceeding 250Kw total cooling capacity the deadline for assessment is 1/1/2009.

For systems exceeding 12Kw total cooling capacity the deadline for assessment is 1/1/2011.

Inspection reports are required to be updated every 5 years.

MGI Ltd is accredited by BESCA (Building Engineering Services Competence Accreditation) to carry out these statutory assessments on all sizes and types of equipment.

Accreditation No.EA/AC000030